EV Chargers in Torrensville, Australia
Explore 1 charging station(s) with real-time analytics and nearby amenities.
Smart Charging Time Calculator
Estimated Time: 22 Minutes
RAA Charge Brickworks
Address: 2 Ashwin Parade
Power: 200 kW
Operator: Independent
Cost: DC is Evening peak 68c kWh (5:00pm to 10:00pm), Standard 59c kWh (all other times), AC is Evening peak 32c kWh (5:00pm to 10:00pm), Standard 25c kWh (all other times)
