Smart Charging Time Calculator

Estimated Time: 22 Minutes

On Shing Street

Address: On Shing Street

Power: 2.7 kW

Standard There are TWO entries for this car park, right next to each other. Choose the FIRST and smaller one, "Sunshine City Phase 4" with "Hourly carpark", do NOT enter the next one, "Loading and unloading zone". Call the number 2630 5693 a few minutes before entering, and a parking staff will go to the spot to unlock the charger. The first level you enter is the level where the EV chargers are, spot 229 and 230 (level 1).

Operator: Independent

Cost: Included in parking charge. Spend 150 HKD, one hour free, spend 300 HKD, 2 hours free

Station Details & Cost Calculator